DLHC was hired as a subcontractor to Alutiiq International Solutions to assist in managing the design and construction of the 19,000 SF Battalion HQ and covered hardstand for the US Army Corps of Engineers (USACE). The project included vertical construction of a two-story CMU and stucco administrative building with brick veneer and covered hardstand, which... Battalion HQ Ft Benning GA
DLHC was awarded this project by the US Army Corp of Engineers, Mobile District. The project was a Design-Build structure that we completed in late 2011. The project included the design and construction of a LEED Silver single story 22,317 SF concrete block Child Development Center at Hurlburt Field, FL. The project consists of a... Child Development Hurlburt Field
This structure was a Design-Build project for a Child Development Center. The project included the design and construction of a 32,000 SF LEED Silver one-story Child Development Center. The Child Development Centers consist of reinforced concrete foundations, floor slabs, and masonry walls. Child Development Center, MacDill AFB, FL